Project Description
9’x24′ torch repair
Swept loose gravel clean from repair area.
Furnished and installed 90lbs. Yosemite reverse cap sheet over repair area.
Spudded, cleaned and primed perimeter tie in of existing roof system.
Heat weld applied modified bitumen roof membrane over repair area.
Tied in newly installed roof membrane to existing roof.
Removed and hauled away debris caused by roofing.