Project Description

New PVC Roofing System
(New Construction)

Removed all existing roofing and insulation above concrete deck and hauled away through elevator.

Installed a tapered EPS system to create sloping on the entire roof, and fully adhered it in place.

Over tapered EPS, adhered in place a ¼” primed cover board to entire roof.

Installed a 60mil Sarnafil G410 PVC membrane and fully adhered it in place. Membranes are heat welded at seams.

Installed new prefabricated flashings at all scuppers, corners and through-roof penetrations.

At parapet walls, new membranes have been fully adhered to vertical surface. Membrane were terminated in place at base and top of parapet using term bar and finished at outer edge with custom fabricated clad metal edging.

At eyebrows on outer perimeter, sealed roof-to-wall transition with building using SIKA Roof Pro liquid membrane.

Provided a manufacturer’s Twenty (20) year No Dollar Limit warranty and a Two (2) year warranty on workmanship.