Project Description

Approx. 15,500 sq.ft. cool roof system restoration

Roof Preparation :

  1. Inspected existing roofing for substrate deterioration (soft spots). Replaced substrate and made level at soft spots.
  2. Thoroughly inspected roof surface for cracks/splits and repaired using either emulsion or mastic, and polyester fabric (three-course method).
  3. Reinforced flashings, and other details as necessary using emulsion and polyester fabric.
  4. Cut back existing edge metal and hauled away.
  5. Furnished and installed new bonderized edge metal. Roofed in edge metal using two layers of modified bitumen roof membrane.

Roofing Execution:

  1. Base Coat & First Ply: Spray applied coat of asphalt emulsion.
    a. Sprayed at an application rate of approximately 6 gallons per 100 square feet and let cure.
    b. Embedded into wet emulsion polyester reinforcing fabric.
  2. Intermediate Coat & Second Ply: Spray applied coat of asphalt emulsion.
    a. Sprayed at an application rate of approximately 2 gallons per 100 square feet and let cure.
    b. Embedded into wet emulsion second polyester reinforcing fabric.
  3. Top Coat: Spray applied White Elastomeric Roof coating at rate of 3 gallon per 100 square feet.
    a. First coat at an application rate of approximately 5 gallons per 100 square feet and let cure.
    b. Second coat at an application rate of approximately 5 gallons per 100 square feet and let cure.
    c. The coating was sprayed using “crosshatch” method.

Additional Items & Guarantees:

  1. Reinforced low spots using additional plies, emulsion, and silicone.
  2. Removed all debris caused by roofing and hauled away.
  3. Provided a 15 (fifteen} year manufacturer warranty on labor, material. (No exclusions on standing water}.