Project Description
(Repairs on 4 ply gravel surfaced BUR)
At all locations where existing mechanical equipment or pipes have been removed, repaired the roof to match the existing.
At all locations where new mechanical equipment or pipes have been installed, repaired the roof to match the existing, tied onto the existing roof properly to make sure that the roof is watertight.
Furnished and installed Portals Plus flashings at new Duct Support legs.
New pipes and Equipment Screen supports were flashed with new lead flashings and single ply umbrellas.
Installed wood blocking under pipes running on top of the roof.
Removed all trash and debris from repair work off the site and disposed of properly.