Project Description
(Roof size: 30,000 sq. ft.)
Removed and hauled away existing roof, including 4 penthouse roofs through the service elevator.
Replaced some damaged substrates.
Installed new Title 24 Energy Efficient Firestone 60 Mil. white Fleeceback TPO (Thermoplastic Polyolefin) membrane fully adhered on concrete surface.
Applied silicone coating on platforms.
Replaced drain covers.
Removed and hauled away debris caused by crew.